MEPCO New Connection 2024

MEPCO New Connection 2024

You can find a lot here if you are trying to get information about Mepco new connection, name change of existing connection or load reduction/expansion. We will provide you complete information within this article through which you can apply for a new connection or change of name in any existing connection as well as load reduction/ extension.

If you’re a current MEPCO customer, you can easily access your MEPCO Bill or utilize the MEPCO Bill Calculator.

MEPCO New Connection Procedure

Before proceeding further in the article, to increase your knowledge, let us tell you how you people submit your application for a new connection. In the first method, you have to apply in person at your nearest Mapco office. While in another way, you can submit your application online through the Electricity New Connection System (ENC).

MEPCO New Connection 2024

For which you will need to complete some necessary steps which are listed below:

  • First open ENC official website from your mobile or computer
  • You will see different options in the sidebar menu, click on Apply
  • Enter all the requested details correctly, and upload all the required documents (remember the size of these files should be maximum 300 KB)
  • Copy of property documents
  • Copy of attested identity card of the applicant
  • Copy of attested identity card of the witness
  • Copy of neighbor’s electricity bill
  • Wiring Contractor’s Test Report
  • And after that click on submit application button
  • Remember after submitting your application you are allotted a specific tracking id which you need in future please note it down.

Additional documents for industrial applicants only

  • Remember that in the case of company name connection and multiple owners, the power of attorney can follow the company’s request and in this context also enter into an agreement with the distribution company.
  • Map of the application to be connected to the applicant.
  • Memorandum of Articles in case of Limited or Private Limited Company.
  • Attested photocopies of full address and National Identity Card of all members of the Board of Directors.
  • Authorization letter signed by all directors on company letterhead as per Form 29.
  • A certificate issued by the Securities and Exchange Commission whose value is equal to the security amount.

Additional papers only in case of change of name and increase or decrease in load

  • Clearance certificate issued by the concerned revenue officer in which no amount is due to the concerned user.
  • Wiring Test Report issued by Electric Inspector (only in case of increase or decrease in load)

How to print Application Form

After successfully submitting your application it is important for you to print the application for your future reference. To print your submitted application you need to complete the below steps.

  • Go to the ENC website and click on the print form button.
  • To print your submitted application you need to enter the tracking ID here.
  • After downloading your application by entering a tracking ID, attach hard copies of all necessary documents with it.
  • After attaching all the necessary documents with your application, go to the concerned office and submit it.
  • Demand notice will be issued after confirmation by the concerned office.
  • After the demand notice is issued, you can go to the ENC website and download it after entering your tracking ID.
  • After downloading the demand notice, pay it in the concerned bank.
  • After paying the demand notice, submit the paid copies to the concerned office.
  • As soon as your demand notice payment confirmation is completed, your connection will be installed.

Estimated time for Mepco new connection:

The duration of getting a new meter connection from MEPCO varies depending on the type of connection you need. MEPCO offers three main types of electric supply connections based on the load capacity: domestic, commercial, and industrial. You can apply for a new connection either online or by visiting the nearest office and filling out a form. You will also need to provide some documents and pay a fee according to your connection category.

Category – 1 (Up to 15 kW)

Sr#StepDays
1First of all, the applicant will submit the application form along with the relevant documents by going to the nearest concerned office and submitting it. After which the office will issue a receipt and seniority number to the applicant. Note that for this purpose the concerned office will create a seniority register as per the date of receipt of the applicant to which the applicant will be given access.1
2The staff of the concerned office will inspect the place of the applicant where the electricity connection is required and evaluate whether it is possible to provide the connection at that place or not. On completion of review, if the provision of connection is not possible, the applicant will be informed with reasons.3
3If on review it is possible to provide connection at the desired location where connection is required, the cost will be estimated2
4Note that the connection installation cost estimate will be hand delivered or mailed to the applicant upon approval.2
5After receiving the estimated expenses, the applicant will deposit it in the concerned bank and submit the receipt in the office.2
6Applicants will submit a wiring test report and the related office will verify it.3
7After which a priority list of an applicant will be prepared by the concerned office on the date of receipt of dues.1
8After preparing the priority list, the concerned office will issue service connection orders.3
9And then the concerned office will contact the store to supply all the necessary equipment for the installation of the connection.3
10After contacting the store, the respective store will issue all the necessary equipment for making the connection.5
11After availability of all the necessary equipment, the office of concerned SDO/Assistant Manager Operations will install the connection.5
TOTAL EXPECTED DAYS30

Category-II (16KW-70KW) 

A category-2 mepco connection has the same steps as category one. But this connection is slower, and it can take up to 44 days from the application to the meter installation.

Category-III (70 KW-500 KW)

A category-3 mepco connection has the same steps as category one and two. But this connection is slower, and it can take up to 73 days from the application to the meter installation.

Change Connection Name/Tariff/Load

  • Go to the ENC official web site.
  • On the sidebar menu, choose Change.
  • Pick the Application Type you want, such as change of name/load/tariff.
  • Only enter the details that are relevant to your application. For example, if you want to change the connection name, only fill in the fields related to that.
  • Upload the following documents (Maximum file size 300 KB).
    • Attested CNIC Copy of Applicant
    • Applicant Electricity Bill Copy
    • Proof of Ownership
  • Click on Submit to complete your application.
  • You will get a tracking ID after submitting your application. Please write down your tracking ID for future use.
  • On the sidebar menu at ENC, select Print Form and enter your tracking ID to print your application form.
  • Print your application form and attach hard copies of all the required documents.
  • Send your application and the attached documents to the office that handles your case.
  • You will receive a demand notice after your application is verified. You can download the demand notice by entering your tracking ID on the ENC website.
  • Pay the demand notice at the bank that is specified on it.
  • Send the paid copy of the demand notice to the office that handles your case.
  • The changes you applied for will be done after the payment of the demand notice is verified.

Conclusion

Finally, in this article, I have shared with you all the necessary information related to installing Mepco New Connection in detail, which will be beneficial for you. Apart from this, let me tell you that if you do not know how to use the Internet and want to make a new connection, then you can apply for it by physically going to the concerned office.

Apart from this, I have shared with you in detail the information about the change in the name of the old connection and the change in the load in this article. I hope all the information mentioned in this article will be beneficial for you.

FAQ

How do I apply for a new meter at Mepco?

You can apply online for new MEPCO meters by visiting the ENC website

How to check MEPCO new connection status?

You can check the status of your Mepco new connection by visiting the ENC website and entering the tracking ID.

In which bank do I need to pay the demand notice?

Banks for paying demand notice may vary so you have to pay your demand notice at the bank named on your demand notice.

Do I need to submit the documents to the MEPCO office after applying online?

Yes, after applying online you need to visit the concerned office and submit the necessary documents along with the application form.